For contractors & property managers
Construction & Remodeling Dumpster Rentals
Pricing for job-site planning
15-yard: $500 3-day rental or $550 Up to 7 days; 20-yard: $550 3-day rental or $600 Up to 7 days; 30-yard: $625 3-day rental or $675 Up to 7 days. Includes up to 1 ton (2,000 lbs). Additional weight is charged at $0.09 per pound over 2,000 lbs. See full pricing.
Suitable projects
- Kitchen and bath remodels
- Interior demolition: drywall, trim, framing lumber
- Flooring, carpet, and cabinetry removal
- Rental property turnovers
Scheduling
Note your target delivery date and whether the project is recurring. A local rental company serving your town confirms the schedule; a request is not a reservation until confirmed.
Before you request delivery
- Estimate heavy debris — shingles and tile add weight fast.
- Confirm placement on site or check street-placement rules with the town.
- Identify any approval-required materials.

Material restrictions
Full list on what can go in a dumpster.
Generally accepted
Typical household and light renovation debris.
- Household junk and clutter
- Furniture (sofas, tables, chairs, dressers)
- Boxes, toys, and general stored items
- Drywall, trim, and framing lumber
- Flooring and carpet
- Cabinets, countertops, and fixtures
- Yard debris such as brush and old fencing
Requires approval
May be allowed with review, weight limits, or added charges. List these on your quote request.
- Concrete, brick, and asphalt
- Soil, dirt, sod, and rock
- Roofing shingles
- Tile and plaster in large quantities
- Appliances
- Mattresses and box springs
- Tires
Not accepted
Do not place these in the dumpster. Ask your town about proper disposal.
- Hazardous or toxic materials
- Paint, solvents, and chemicals
- Batteries
- Fuel, oil, and propane tanks
- Medical waste
How the rental works
- 1
Request a quote
Share your town, project, materials, and where the dumpster can go.
- 2
Confirm details
A local rental company serving your town confirms pricing, date, and placement.
- 3
Load the dumpster
Fill it at your pace during the rental period — keep debris level with the top.
- 4
Pickup
The rental company hauls it away; any weight over the included ton is billed per pound.
Contractor questions
What happens if I exceed the included weight?
What materials require approval?
Do I need a permit?
Plan your next job
Tell us about your project and a local rental company will follow up to confirm pricing, materials, and delivery.
